Daytime Noise Monitoring Results                    
                           
Station NM6 Customs' Marine Base (Block H of Government Dockyard) Rooftop            
Date Start Time End Time  Weather Noise level (dB(A)), 30 min+ Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Mean Temp. (°C) Mean Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
01-Jun-11 16:00 16:30 Sunny 68 70 63 excavation in process; crane in operation other construction site nearby - 27.9 <5 m/s Rion NL-31 Rion NC-73
07-Jun-11 13:31 14:01 Sunny 67 70 63 excavation in process; crane in operation other construction site nearby - 29.6 <5 m/s B&K 2238 B&K 4231
13-Jun-11 15:00 15:30 Sunny 64 66 62 excavation in process; crane in operation other construction site nearby - 28.7 <5 m/s B&K 2238 B&K 4231
25-Jun-11 14:03 14:33 Sunny 65 66 64 excavation in process; crane in operation other construction site nearby - 28.7 <5 m/s B&K 2238 B&K 4231
27-Jun-11 11:15 11:45 Sunny 67 68 65 excavation in process; crane in operation other construction site nearby - 29.4 <5 m/s B&K 2238 Rion NC-73
      Min. 64                  
      Max. 68                  
                           
 + - Facade measurement